Roles & Responsibilities Matrix

The Roles & Responsibilities Matrix is a cornerstone document aligning roles and responsibilities over the lifecycle of a sponsored project and is required by .

The Roles & Responsibilities Matrix is available in the table below. View the complete background, process, and timeline for the development of the Roles and Responsibilities Matrix.

Matrix Helpful Hints

Key to Responsibility Acronyms
 

 

  • PI = Principal Investigator
  • OCG = Office of Contracts and Grants
  • CCO = Campus Controller's Office
  • RIO = Research & Innovation Office
  • VP = Venture Partners
  • IP = Intellectual Property
  • IFR = Industry & Foundation Relations
  • COI = Conflict of Interest Office
  • IRB = Institutional Review Board
  • IACUC = Institutional Animal Care and Use Committee
  • PAO = Property Accounting Office

The roles outlined in this matrix can happen in parallel with other roles and the order represented here is not exact.

Preparing to Submit a Proposal

 
Locate funding opportunityPrimary: PI
Support: RIO, IFR - for industry research
Read and interpret proposal guidelinesPrimary: PI
Support: OCG, IFR - for industry research, Compliance Offices
Prepare Non-Disclosure Agreements, as neededPrimary: OCG
Support: PI, IFR for industry research, IP, VP
Prepare Teaming Agreements, as neededPrimary: OCG
Support: PI, IFR - for industry research
File Annual Primary: PI
Support: Compliance Offices

Proposal Development

 
Obtain and understand sponsor instructions for proposal preparationPrimary: PI
Support: OCG, Dept. Administrator
Identify Cost Sharing in proposal and obtain cost share approval from DepartmentPrimary: PI
Support: OCG, Dept. Administrator
Identify and indicate approvals needed for proposalPrimary: OCG
Support: PI
Completion of Proposal Submission Request (PSR) FormPrimary: PI
Support: Dept. Administrator
Provide guidance to PI on proposal preparationPrimary: OCG
Support: Dept. Administrator, VP, IFR - for industry research
Develop and revise technical narrative, Bio sketches, current and pendingPrimary: PI
Support: Dept. Administrator
Develop administrative pages of proposalPrimary: OCG
Support: Dept. Administrator
Ensure required effort available, if awarded Primary: PI
Support: CCO
Identify subcontractors/collaborators Primary: PI
Request and collect necessary Subcontractor Budget, Statement of Work (SOW), Commitment Form and Sole Source JustificationPrimary: PI
Support: OCG, Dept. Administrator
Draft Budget [Proposal Development module in Â鶹ӰԺ eRA will empower PIs to create budgets]Primary: OCG
Support: PI, Dept. Administrator
Review BudgetPrimary: PI
Support: OCG, Dept. Administrator, IFR - for Industry research
Revise Budget in partnership with PIPrimary: OCG
Support: PI, Dept. Administrator

Proposal Review and Approval

 
Review proposal package, including cost-share requirements, before sending proposal and completed Proposal Submission Review (PSR) Form to OCG at least 5 Business Days in advance of submission deadline Primary: PI
Support: Dept. Administrator
Provide institutional review and approval of proposal and budgetPrimary: OCG
Review proposed Cost Sharing commitment for compliance with University policy and sponsor termsPrimary: OCG
Support: PI, CCO
Identify non-standard F&A (Indirect Cost) rate requiring an IDC Addendum or IDC WaiverPrimary: OCG, IFR - for industry research
Submit to OCG F&A (Indirect Cost) rate waiver approval requestsPrimary: PI, IFR - for industry research
Support: OCG
Review subcontractors’ proposals and check for their institutional approvalPrimary: OCG
Support: PI
Make revisions and corrections to proposal after institutional reviewPrimary: PI
Support: OCG
Identify issues, if anyPrimary:PI
Support: OCG
Obtain necessary Primary: PI
Support: Dept. Administrator, Compliance Offices
Initiate approvalsPrimary: PI
Support: Dept. Administrator
InitiateapprovalsPrimary: PI
Support: Dept. Administrator
Initiate Primary: PI
Support: Dept. Administrator, Compliance Offices
Initiate  Primary: PI
Support: Dept. Administrator

Proposal Submission

 
Submit proposals to sponsors (OCG must be involved in all proposal submissions.)Primary: OCG
Support: PI
Record proposal submission in Â鶹ӰԺ eRA Primary: OCG

Pre-award Activities

 
Prepare/collect additional paperwork for sponsor (i.e., Just In Time (JIT))Primary: OCG
Support: PI, Dept. Administrator
Review and submit additional paperwork to sponsor (JIT)Primary: OCG
Support: PI
Request pre-award spending account if needed, including Budget and Period of Performance (PoP)Primary: PI
Support: Dept. Administrator
Approve pre-award spending accountPrimary: OCG
Set up pre-award spending accountPrimary: CCO

Notice of Award, Review, and Acceptance

 
Record award information in Â鶹ӰԺ eRA systemPrimary: OCG
Review awardPrimary: OCG
Review and negotiate terms and conditions in awardPrimary: OCG
Review nonstandard Intellectual Property (IP) terms, and negotiate IP issuesPrimary: OCG
Support: VP
Review and negotiate financial (including reporting and invoice) terms and conditions in award noticePrimary: OCG
Support: CCO
Assess whether awarded budget is different from that proposed and determine if rebudgeting is necessaryPrimary: OCG
Support: PI
If awarded budget is different from that proposed, notify OCG if change in Statement of Work (SOW) requiredPrimary: PI
Support: OCG
Review the approved budget, identifying separate projects/budgets if needed Primary: PI, Dept. Administrators
Support: OCG
Accept terms and conditions of the award on behalf of the University; sign on behalf of RegentsPrimary: OCG
Upload final award document into Â鶹ӰԺ eRAPrimary: OCG

Award Set-up

 
Obtain needed internal approvals (e.g., Human subjects, Export Control, Cybersecurity, Biosafety, IACUC) Primary: PI
Support: Dept. Administrator, OCG
Verify internal approvals required are in place prior to project set-upPrimary: OCG
Support: PI, Dept. Administrator
Verify current year DEPA is on filePrimary: OCG
Support: PI
Enter initial award data in Â鶹ӰԺ eRAPrimary: OCG
Set up Cost Sharing SpeedTypePrimary: CCO
Schedule technical/final reports in Â鶹ӰԺ eRA (accuracy is critical at set up to facilitate efficient closeout)Primary: OCG
Schedule other non-financial reports in Â鶹ӰԺ eRA - i.e., milestones (accuracy critical at set-up to facilitate efficient closeout)Primary: OCG
Send requests for project(s) setupPrimary: OCG
Schedule financial reports Primary: CCO
Assign Project Number (auto-assigned in Â鶹ӰԺ eRA)Primary: CCO
Make Evaluation of  Exchange Transaction and documentPrimary: CCO
Verification of Project Budget and correlate to Budget Account Codes Primary: CCO
Enter award data into PeoplesoftPrimary: CCO
Create SpeedType in Peoplesoft and e-mail notification resultsPrimary: CCO
Create distribution codePrimary: CCO
Create Budget Journal Entry in PeoplesoftPrimary: CCO

Subcontracting Out

 
Create Subcontract record in Â鶹ӰԺ eRAPrimary: OCG
Create Purchase Order Requisition in Marketplace for SubcontractPrimary: Dept. Administrator
Complete and submit Sole Source Justification and Sub Review Form Primary: PI
Support: Dept. Administrator
Gather SOW, Budget, Budget Justification, Sub Commitment Form, Rate Agreement (if not included in proposal)Primary: Dept.  Administrator
Support: PI, OCG
Draft agreement and send to subrecipientPrimary: OCG
Negotiate terms with subrecipientPrimary: OCG
Review and approve final subcontract document, upload to Â鶹ӰԺ eRAPrimary: OCG
Notify PI and Department of execution of subagreementPrimary: OCG
Issue/Approve Purchase Order for SubcontractPrimary: OCG
Receive, review and approve Subcontractor's invoice and authorize payment  Primary: PI
Support: Dept. Administrator
Coordination with OCG and Procurement Service Center (PSC) on Subcontractor issuesPrimary: Dept. Administrator
Support: PI
Coordinate issue resolutions (e.g., invoicing schedule, billing questions, deliverable scheduling, No-Cost Extension requests) with subcontractorsPrimary: PI
Support: OCG, Dept. Administrator
Coordinate financial issue resolution with subcontractorsPrimary: PI
Support: Dept. Administrator
Request amendments to subcontract as needed, providing budget revisions, as neededPrimary: PI
Support: Dept. Administrator
Provide marked up Purchase Orders documenting amendments Primary: Dept. Administrator
Support: PI, OCG
Draft, negotiate, and finalize amendmentsPrimary: OCG
Provide copies of Subcontract Amendments to PI and DepartmentPrimary: OCG
Confirm completion of Subcontractor's work, receipt of Final Invoice and cost share fulfillmentPrimary: PI
Support: Dept. Administrator
Transmit out Subcontractor closeout documentsPrimary: OCG
Collect Subcontractor closeout documents and finalizePrimary: OCG
Support: PI, Dept. Administrator

Award Management - Financial

 
Overall responsibility for financial and programmatic stewardship of awardPrimary: PI
Review Project Budget and create Spending and Procurement PlanPrimary: PI
Support: Dept. Administrator
Generate requisitions in purchasing systemsPrimary: Dept. Administrator
Support: PI
Initiate Re-budgeting request with OCG where Sponsor Authorization is required - (For change of scope, additional Subcontracts, F&A affected)Primary: PI
Support: Dept. Administrator
Prepare revised budgetPrimary: PI
Support: Dept. Administrator
Review and submit re-budgeting request to sponsorPrimary: OCG
Monitor project spend ratePrimary: PI
Support: CCO, Dept. Administrator
Notify sponsor of anticipation of 75% spend, if notification is required, and copy CCO and OCG Primary: PI
Support: CCO, Dept. Administrator
Approve  Primary: CCO
: Post and Track on General Ledger (GL)Primary: Dept. Administrator
Support: CCO
Ensure fulfillment of cost share commitmentsPrimary: PI
Support: CCO, Dept. Administrator
Request appointment in HRMSPrimary: Dept. Administator
Support: PI
Monitor award expenditures for allowability, allocability, and reasonableness throughout Period of Performance Primary: PI, Dept. Administrator
Ensure proper documentation exists and is retained to support appropriateness of expendituresPrimary: PI, Dept. Administrator
Identify changes to approved Budget that require sponsor approval and notify OCGPrimary: PI
Support: Dept. Administrator
Review deviations in expenditures Primary: PI
Support: CCO, Dept. Administrator
Spot audit expendituresPrimary: CCO
Review accuracy of account codes/cost allocations/suspensionsPrimary: Dept. Administrator
Support: CCO
Reconcile accounts on a monthly basisPrimary: Dept. Administrator
: Initiate journal entry and provide supporting documentation for department approvalPrimary: Dept. Administrator
Cost transfers: Review request and approvalPrimary: CCO
Support: Dept. Administrator
Initiate Carryforward (when sponsor approval required) request to Department AdministratorPrimary: PI
Support: Dept. Administrator
Request Carryforward from sponsorPrimary: OCG
Support: CCO
Program Income: Identify, report, and ensure posting to appropriate account codesPrimary: Dept. Administrator
Support: PI, CCO
Monitor and reconcile balances to ensure spending within budget and to prevent overexpenditurePrimary: PI
Support: CCO, Dept. Administrator
Approve payment of subcontract invoicesPrimary: PI
Support: Dept. Administrator
Verify final subcontractor invoice receiptPrimary: PI
Support: Dept. Administrator

Award Management - Non Financial

 
Conduct the research project and provide oversight and stewardship on all research activitiesPrimary: PI
Initiate , if neededPrimary: PI
Support: Dept. Administrator, VP
Review programmatic changes to projectPrimary: PI
Support: OCG
Coordinate administrative and award term issue resolutions with sponsorPrimary: OCG
Support: PI, Dept. Administrator
Prepare and finalize Materials Transfer AgreementsPrimary: OCG
Support: PI, IP, VP
Notify OCG of changes to key personnelPrimary: PI
Support: Dept. Administrator
Request change of key personnel from sponsorPrimary: OCG
Support: PI
Identify need for No-Cost Extensions and submit request to OCG Primary: PI
Support: Dept. Administrator
Review and Submit No-Cost Extension notifications/requestsPrimary: OCG
Notify OCG of any anticipated award changes (scope, schedule, etc)Primary: PI
Negotiate award changes (deliverables, schedule, scope)Primary: OCG
Support: PI
Provide deliverables as required, on schedulePrimary: PI
Support: Dept. Administrator
Ensure that all effort reports are certified as requiredPrimary: PI
Support: CCO, Dept. Administrator

Award Management - Non Financial -- Property

 
Review and understand sponsor's property terms in the award (each department should have an individual whose job scope includes property liaison)Primary: PI, OCG
Support: Dept. Administrator
For fabrications, submit  online and email a new chartfield request to CCO Property Accounting Office (PAO)Primary: Dept. Administrator
Support: CCO, OCG
Identify need for Property and notify OCG and Department AdministratorPrimary: PI
Initiate and substantiate request for equipment and submit to OCG PropertyPrimary: PI
Support: Dept. Administrator
Request prior approval from sponsor for equipment purchases, when requiredPrimary: OCG
Support: PI, Dept. Administrator
Request purchases in Marketplace and attach all relevant documentationPrimary: Dept. Administrator
Support: PI
Approve Marketplace equipment and property purchases > $10K and review after-the-fact equipment and property purchases between $5-9,999K to ensure contractual obligations are metPrimary: OCG, Dept. Administrator
Review cost transfers involving equipment and property expenses to ensure all contractual obligations are met. CCO is responsible for giving final approval for all cost transfers.Primary: OCG, CCO, Dept. Administrator
Support: PI
Track government or sponsor titled equipment purchasesPrimary: OCG
Support: Dept. Administrator
Confirm physical receipt of government or sponsor titled equipment, and notify OCG Property immediatelyPrimary: Dept. Administrator
Support: PI, OCG
Verify functionality of government or sponsored titled equipment; advise OCG Property if equipment is not functioning correctly after testingPrimary: PI
Support: Dept. Administrator, OCG
Track receipt of University titled sponsored projects equipment Primary: Dept. Administrator
Support: PI, CCO
Enter equipment into Asset Management SystemPrimary: CCO
Support: OCG
Receive government furnished property from sponsor and notify OCG Property immediatelyPrimary: PI
Support: Dept. Administrator, OCG
Assign tag numbers to all equipment and generate tags (CCO assigns tag numbers to all University titled equipment, OCG assigns tag numbers to Government or Sponsor titled property and deliverables, CCO prints all tags)Primary: CCO
Support: OCG
Attach government titled sponsored projects equipment tags to equipment (must be done within 3 business days of physically receiving the property)Primary: OCG
Support: Dept. Administrator
Attach University titled sponsored projects equipment tags to equipmentPrimary: Dept. Administrator
Support: CCO

Continually monitor location/ functionality of all equipment. Notify department property administrator of any changes. Department will notify appropriate office.

*Notify OCG Property immediately if any government or sponsor titled equipment needs repairs.

Primary: PI
Support: Dept. Administrator
Request prior approval for repairs involving government or sponsor titled equipmentPrimary: OCG
Support: PI, Dept. Administrator
Update project records for government titled equipmentPrimary: OCG
Support: CCO
Conduct annual and closeout inventory of government titled equipmentPrimary: OCG, Dept. Administrator
Support: PI
Request disposition of government or sponsor titled equipment at closeoutPrimary: OCG
Support: Dept. Administrator
Submit Property Disposal Request Form for any tagged equipment or untagged non-capital property that needs to be disposed, donated, cannibalized, or transferredPrimary: Dept. Administrator
Support: CCO, OCG
Submit Off-Campus Equipment Agreement Form prior to any tagged equipment or untagged non-capital property leaving campus (OCG will determine if a Bailment Agreement is needed)Primary: Dept. Administrator
Support: CCO, OCG
Prepare and submit property reports to sponsor when neededPrimary: OCG

Financial Reporting/Billing for Sponsors

 
OCG ensures contracts include billing terms and conditions Primary: OCG
Support: CCO
CCO confirms the billing terms, conditions and payment method written in the agreements from OCGPrimary: CCO
Create invoicePrimary: CCO
Establish engagements with sponsor billing and payment systemsPrimary: CCO
Generate Monthly Spend ReportsPrimary: PI, Dept. Administrator
Review Monthly Spend ReportsPrimary: PI, Dept. Administrator
Identify the need for submission of a financial status reportPrimary: CCO
Support: PI, Dept. Administrator
Notify departments of upcoming final financial reportsPrimary: CCO
Obtain supporting documentation for cost sharing and prepare and submit cost-share reportPrimary: CCO
Support: PI, Dept. Administrator
Provide institutional approval on deobligations/relinquishmentsPrimary: OCG
Support: CCO
Prepare and submit invoices and financial status reports to sponsorsPrimary: CCO
Upload and submit financial reports to sponsor along with required supporting documentation for audit purposesPrimary: CCO
Support: Dept. Administrator
Submit Sponsor required financial reportsPrimary: CCO
Support: Dept. Administrator

Cash Management

 
Accounts Receivable Management Primary: CCO
Manage cash (handling of checks, etc.) and deposits of checksPrimary: CCO
Support: Dept. Administrator
Process Letter of Credit drawdown for a specific federal funded agencyPrimary: CCO
Record Letter of Credit draw for a specific federal funded agencyPrimary: CCO
Monitor and pursue the collections of overdue payments from sponsorsPrimary: CCO
Refund excess cash back to sponsor and provide proper documentationPrimary: CCO

Property, Technical and Other Reports

 
Identify reporting requirements and due date and prepare for submission the following: 
Annual and final technical report/summary of research; notify OCG of submissionPrimary: PI
Support: OCG, Dept. Administrator
Quarterly, annual, or final financial reportPrimary: CCO
Quarterly, annual, or final property reportPrimary: OCG
Support: PI, Dept. Administrator
When there is new technology, patents, inventionsPrimary: PI
Support: VP
Submission of all technology, patent, and invention reportsPrimary: OCG
Contract-specific monthly financialsPrimary: Dept. Administrator
Technology Control Plan reports when requiredPrimary: Compliance Offices
Foreign National reporting Primary: PI
Support: Dept. Administrator
Maintain official copies of progress reportsPrimary: PI
Support: OCG, Dept. Administrator

Certification of Time and Effort

 
Complete effort reports in a timely mannerPrimary: PI
Track current and pending effort commitmentsPrimary: PI
Support: Dept. Administrator
Ensure compliance with effort reporting policyPrimary: CCO, Dept. Administrator
Provide local oversight for effort certificationPrimary: Dept. Administrator
Provide guidance in interpretation of CU Policies and Federal Regulations as well as monitor compliance with reporting requirementsPrimary: CCO
Provide training/presentations on activity reporting policies and proceduresPrimary: CCO
Notify OCG of changes in effort requiring sponsor approvalPrimary: PI
Support: Dept. Administrator
Request sponsor approval if effort changes and must have sponsor approvalPrimary: OCG
Support: PI, Dept. Administrator
Oversee activity planning, confirmation process, and overall compliance with this policy in his/her departmentPrimary: PI
Final responsibility for the financial management of their sponsored projectsPrimary: PI
Understand and comply with sponsor requirements for notifications regarding changes in personnel activityPrimary: PI
Certifies their own effort and certifies staff effort or designates someone with a suitable means of verification that the work provided to certify staffPrimary: PI
Communicates with Project Directors on multidisciplinary/multi institutional awards to ensure commitment of activity has been metPrimary: PI
Notify department administrators to make accounting adjustments as needed and ensure that minimum mandatory requirements are metPrimary: PI
Provide notifications of reduction or charges in activity to departmental administratorsPrimary: PI

Closeout Process

 
Identify awards ready for closeout Primary: OCG, CCO
Support: PI, Dept. Administrator
Send closeout notices to department 90 days before project end datePrimary: CCO
Reconcile account to ensure Cost Sharing commitment has been fulfilledPrimary: CCO
Support: Dept. Administrator
Review budget deviations at closeout; all expenses must be final within period required for timely closeoutPrimary: CCO
Support: PI, OCG, Dept. Administrator
Coordinate with department to inactivate cost share SpeedType(s)Primary: CCO
Support: Dept. Administrator
Ensure expenditures/cost transfers have been posted to correct accounts in a timely mannerPrimary: Dept. Administrator
Support: PI
Review and approve cost transfersPrimary: CCO
Review system financial reports for allowable/budgeted expenses and resolve issuesPrimary: PI, Dept. Administrator
Support: CCO
Contact department to coordinate appropriate action for interest bearing account resolutionPrimary: CCO
Support: Dept. Administrator
Ensure final property inventory is complete and accuratePrimary: PI
Support: OCG, Dept. Administrator
Transfer residuals on fixed price agreementsPrimary: CCO
Support: PI, OCG, Dept. Administrator
Refund excess cash back to the sponsor and provide proper documentationPrimary: CCO
Maintain official financial documents for sponsored projects per Records Retention requirementsPrimary: CCO, Dept. Administrator
Certify  Primary: PI
Support: CCO, Dept. Administrator
Fabrication subclass reviewedPrimary: PI
Support: CCO, Dept. Administrator
Encumbrances are reviewed/closedPrimary: PI, Dept. Administrator
Support: OCG, CCO
Subcontractor encumbrances removedPrimary: OCG
Support: Dept. Administrator
Identify any inventions and make disclosure to VPPrimary: PI
Support: VP
Prepare all except for invention informationPrimary: OCG
Support: VP
Ensure all inventions/patents have been identified, included on forms and forms signedPrimary: OCG
Support: PI, Dept. Administrator
Verify final financials, final invoice, and payments received; file with project documentsPrimary: CCO
Support: PI, OCG
Prepare Release of Claims and AssignmentsPrimary: OCG
Support: CCO
Submit Release of Claims and AssignmentsPrimary: OCG
Ensure that all Financial Reports have been submitted to sponsor and available for auditPrimary: CCO
Support: Dept. Administrator
Ensure that all required award closeout documentation has been submitted to sponsor, is filed electronically with project documents, and is available for auditPrimary: OCG
Inactivate PeopleSoft project SpeedTypes and enter retire datePrimary: CCO
Confirm completion of subcontractor's work and receipt of final invoicePrimary: PI
Support: Dept. Administrator
Transmit out subcontractor closeout documents (to PI and then Agency's Certification)Primary: OCG
Support: PI, Dept. Administrator
Collect subcontractor closeout documents and finalize (Agency, Marketplace with Department and CCO)Primary: OCG
Support: Dept. Administrator
Submit to OCG Subcontract--PI certification for closeoutPrimary: PI
Support: Dept. Administrator
Review subcontractor's release of claimsPrimary: OCG
Support: PI, Dept. Administrator
Review final invoice with final financial statements for closeout purposesPrimary: CCO
Support: OCG
Confirm subcontracts are closed prior to closing the primePrimary: OCG

Audit Preparation

 
Coordinate the A-133 audit for the entire UniversityPrimary: CCO
When selected, responsible for responding to A-133 auditors transactional requests, completing the audit questionnaire, and participating in the audit interview with the PIPrimary: CCO
Coordinate the CPSR Audit for the entire UniversityPrimary: PI
Support: PSC, OCG, Dept. Administrator
Serve as liaison to sponsors on audit requests and visitsPrimary: CCO
Support: OCG